Onni Group is the general contractor and developer. The Reed at Southbank (234 West Polk.) Lendlease is the general contractor and developer. Plumbers Local 130 Parking Garage (1371 West Randolph.) W.E. bKL Architecture is the design architect. Sterling Bay and Magellan Development are the co-developers. Pelli Clarke Pelli is the design architect.Ģ. Salesforce Tower (333 West Wolf Point Plaza.) Walsh Construction is the general contractor.(And one of them isn’t even in operation yet.) The Chicago Seven are: But seven tower cranes ain’t a lot of tower cranes. Posted in Tower Cranes | Tagged 1000M, 1306 E 61st, 1371 West Randolph, 164 North Peoria, 166 North Aberdeen, 345 North Morgan, 354 North Union, 410 South Wabash, 4611 North Broadway, 513 South Damen, ALLY Lincoln Yards, HUGO, Obama Presidential Center, Salesforce Tower, The Reed at Southbank, Tower Cranes | Leave a reply I’m almost sorry I counted, as Chicago dips to just seven tower cranes in the airįine, that seems a little dramatic. Here are the five tower cranes we *do* have: That’s a 20-story tower, and will need a TC for sure. Maybe one tower crane to build both nine-story buildings?ġ66 North Aberdeen is in caisson mode. Let’s keep an eye on LG Development’s HUGO project at Hudson and Chicago. And 178 West Randolph and 320 South Clinton have permits, but. 164 North Peoria has wrapped up caisson work.Ĥ10 South Wabash has completed caissons, but we’re still waiting for a tower crane permit for it.ĭon’t forget, 1000M (1000 South Michigan) had a stub in the ground, but the crane was never erected.The Obama Center has a permit for three of them.We have more on the way soon, with eight having permits and expected to be in the air relatively soon: Yeah, our tower crane count has dipped to five, with 2050 West Ogden and 300 North Michigan recently (or currently) being taken down.īut take heart, Chicago. Inspected all structural elements i.e.I don’t usually do a tower crane count mid-month, but dang, only five of them? Maintained daily records and provide non-compliance reports and/or their subsequent resolutions. Periodically inspected and performed material testing on drilled piers secant pile wall matt foundation pre-stressed precast concrete office structure slab on grade asphalt and/or concrete drives, aprons, sidewalks, streets structural steel, compaction tests and proof rolling concrete and rebar placement installation of roofing and waterproofing and installation of all fire proofing (i.e. Obtained core samples of the placed concrete paving to determine in-place thickness and density Inspected pavement areas for compliance with Contract Documents A partial listing of ECS’ services includes: ECS Chicago is extremely proud to have worked on this prestigious project, which to date is the tallest building that ECS has ever worked on. Visible from three directions and situated in a prominent location, the Salesforce Tower is a nationally recognized project that has changed the landscape of Chicago’s skyline. Fall Protection, Design, Testing and CertificationĮCS provided construction materials testing for a 60-story 1.2 million sf riverfront office building.Construction Quality Assurance Observations (QAO).Document Constructibility and Peer Review.Structural Engineering Consulting Services.PFAS Assessment and Monitoring Program Assistance.Biological, Ecological and Habitat Monitoring.Underground & Above Ground Storage Tanks.
0 Comments
Leave a Reply. |
Details
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |